Ver 4/15/16 129
PROJECT MANAGEMENT &
BUSINESS ANALYSIS
-
Project Management
-
Business Management
-
Business Systems Analyst
-
Strategy and Planning
-
Enterprise Environments
-
PMO/Non-PMO Environments
-
Waterfall (Prince2), Agile, Hybrid
-
Product Owner / Scrum Master
-
Team Leadership/Management
-
Vendor, Consulting Management
-
Executive Reporting & Presentations
-
Project scoping
-
Requirements Gathering
-
Resource Planning & Scheduling
-
Costing & budgets
-
Problems Management
-
Risk Management
-
Change Management
-
Technical Documentation
-
Process Improvement
-
System & Application Life Cycle Mngt
-
Policy and Procedure Development
-
System & Application Life Cycle Management
-
Lean Six Sigma
-
ITIL
-
Compliance, Sox, PCI, Change Management
-
Process Diagram & Modeling
-
Cloud & Virtual infrastructure
-
Programming & Software development
-
Networking & Security Knowledge
-
Highly Adaptable and Versatile
-
Analytical Thinker, Problem Solver
-
Root Cause Analysis
-
Complex Data Analytics
-
MS Project & MS office suite
-
Visio, Complex Diagrams
-
PowerPoint with Animation
-
Excel Automation Through VBA Programming
-
Power Pivot / Query / BI
-
Technically, Mechanically, and Electronically Inclined
-
Disaster Recovery and Business Continuance
-
Data Center Builds and Migrations
PM, BA, Architecture, representations have been combined due to performing multiple roles that complement each other in a majority of projects. This provides me an advantage in that when preforming any role I am able to interface, anticipate, and validate the project needs from the other roles. I thrive on taking problems and turning them into tangible solutions.
Nutrien Agricultural Solutions- Power BI Development
Product Owner/PM/BA/Scrum/DA/QA
Reproductions examples in development
EMCOR
PM/BA/DA
Reproductions examples in development
Project Management & Business Analyst ,
Working with in PMO Global Environments
Warnaco / PVH - Phillips-Van Heusen
Global Systems Migrations, Upgrades, and Roll-outs
Data Center & Company Migrations
-
Corporate data center migration, 275 servers
-
Server domain migration, 365 servers, 20 sites to PVH
Divisional systems integrations/migrations
-
Lejaby-Euralis ingratiation
-
Authentic Fitness / Speedo ingratiation
-
Ocean Pacific ingratiation,
-
Body Slimmers by Nancy Ganz
-
Designer Holdings Inc., Calvin Klein Jeans
-
Calvin Klein Underwear ingratiation
-
Calvin Klein European
-
GJM Group ingratiation
-
Allen B. Schwartz ingratiation
Global Server OS Upgrade Proj DashSelf-developed Excel project tracking dashboard. pulls all project information from server tracking database |
---|
Server OS Upgrade Project425 servers required evaluation for operation system upgrade or remediation |
Master AD Mig Template |
Server World MapYear 2012 |
Commvault Rollout Map |
Advanced ChartingTime Clock, Work, Systems |
Advanced Charting2003 Mig Proj Resource Layout |
Warnaco Migration to PVH |
Global Projects Managed Warnaco / PVH
-
Active Directory & version migrations upgrades
-
Acronis - co-management
-
Air LAN spread-spectrum
-
Argent Guardian
-
BlackBerry Enterprise Server (BES)
-
Citrix/XEN, Company application access
-
CommVault backup rollout, 20 Sites
-
CommVault archiver, encryption
-
Disaster Recovery and Business Continuance
-
Dell Kace Endpoint Management
-
Demand Solutions
-
DMZ, Firewall, Proxy
-
Double Take
-
Exchange v5.5 to v2003, v2008 cut 23 sites to 8 sites
-
Exchange archiving - initial process with Mimosa
-
Getpaid, Fax Server, Billing & Account receivables
-
File Server Clustering
-
GFI Languard
-
Hyperion co-management / team application support
-
IT infrastructure website
-
Infrastructure life cycles management, rolling projects
-
Kace patch management
-
Kace systems deployment
-
Lab Environment, AD, Exch, VM, Backup, SQL
-
Licensing
-
Mail Marshal load balancing
-
NetIQ Appmanager, HW ,SW, Web, Email, performance monitoring, 20 sites
-
NetIQ Directory and Resource Administrator (DRA)
-
OS upgrade project, 425 servers, 30 sites / PVH
-
PLM, PDM, & EPICOR co-rollout and upgrades
-
Project Server / PWA
-
Quantum backups systems and de-duplication HW
-
QNET
-
SharePoint - Pilot - co-management
-
SAN, major hub sites
-
Server life cycles management
-
SQL Server Consolidation
-
SQL clustering
-
Trend Micro/ Symantec AV
-
WAN acceleration devices, Blue-coat /Netscaler
-
VMware clusters in main hub sites
-
Warehouse & distribution, on site server systems.
Majority of these are global projects, varied between 32 and 20 sites throughout US , Canada, Europe, Asia, South America.
Application Development with Data Migration Sikorsky
Process Flow Reproduction |
---|
Simple Swimlane Example |
r25JEO6K |
Project Link Dash Rep |
Video Surveillance System |
-
PM / BA / DA.
-
Kanban model SLDC, UAT. -
-
Migration of United Technologies applications to new Sikorsky systems with newly developed web interfaces, SQl DB back end, and or in SharePoint.
-
Ergonomic Systems
-
Environmental Health & Safety Systems
-
Permits, Audits, and Compliance
-
Incident Tracking.
-
Medical
-
-
Commercial Aviation Safety Management Systems Software, Analyzed business needs of outgrown in-house app. requirements, process modeling for multi departmental use, application evaluations, then project managed implementation. PM/BA Waterfall
-
Presentations for management, and military officials.
-
Natural gas meter monitoring systems, networking.
-
Business Analysis. * Analyst / **Analyst & designer
-
Design 350 Site Camera Surveillance System. Redundant high-speed servers, SAN, network design, distribution points, and wiring. **
-
Corporate Badging System, Analysis in Security Formats and Integration with LM *
-
Flight Field Camera systems, Analysis of Systems capable of high detail at long distances.*
-
Analysis on license plate reader inconsistencies with recommendations which improved accuracy. *
-
Please note: all documents and details shown here, are either reproductions with mock-up data, or are no longer in existence. Some project material has not been presented due to lack of documentation availability, or due to privacy agreements. Logos fall under the fair use in respects to the Lenham act
Data Center Builds and Modifications
-
New Corporate DC build, 4500 Sq. - IT was informed we had purchased a new building, and we were moving, we had 9 months to complete. Done on time & budget.
-
Data center migration
-
Dual sites maintained for phased user migration to new building.
-
-
New NY, DC build, 520 Sq. Ft. CKJ acquisition
-
DC systems migration, data migration, new equipment implementation.
-
- New NY, DC Build, 670 Sq. Ft. CKU acquisition
- DC systems migration, data migrations, new equipment implementation.
-
Data center modification for SAP Implementation 24 Unix sys, and 40 windows servers.
- PM - Business case, charter, WBS, budget, RACI, schedule, managed teams and vendors. Waterfall.
- BA - Requirements & specifications, power ,AC, UPS, rack, backup, network.
- Designer - Room layout, UPS, PDU, power runs, phase balancing, plug types, network & server placement, cable types and runs, racks, AC flow and calcs. Visio, Excel.
-
Analyzed, Specified, and Managed Project , nearly every components of these builds, vendor management, power specs, generator, redundant UPS power, PDU and power balancing. Redundant cooling. Raised floor spec to accommodate, air flow, with two layer cable tray runs, along with 3rd layer of power whips. Copper and fiber runs, air vanes for laminar flow, physical security access and camera surveillance system. Rack layout, network equipment and distribution points. IDF closets, NOC for 24x7 operations, isolated lab environment, build room, technicians room, storage, onsite tape storage. Knowledge of fire suppression and codes. EMI mitigation. Documentation, standards, General maintenance plan, and testing. Plan also included micro-dust with zinc whisker mitigation, sometimes overlooked.Knowledge of networking, cat wire, short haul fiber, LAN, WAN, VLAN, MPLS, load balancing, worked with Telco companies like Level 3.
Worked with internal, and external facility's management.
Environments shown no longer exist, and are non-confidential, Not all docs available.
DC |
---|
Data Center |
Data Center |
Self Developed Organizer
-
Designed for quick track, backtrack, prioritize, plan, document, search, and report on items to complement projects, and planning.
-
Smart auto-replace of abbreviation and phrases, related to context.
-
Smart auto prefill of Project, Type, and *PWA categories for granular reporting.
-
Auto insert of hyperlink to project files/Info/web based on subject criteria.
-
Quick cross ref to Outlook Email subject lines
-
Easy multiyear reporting, Search Criteria, Time, Project, Type, PWA categories.
-
Quick multi-method compound searching
-
Scheduled reminders.
-
Action log & undo.
-
Text to Speech.
-
Phone# Stripping from line, and dialing via DTMF.
*PWA - Project Web Access category for task time tracking in project server to apply charge back for each project.
Project Management Tracking
This is a all projects report I developed to deal with project management years prior to having a PMO and a project server. This was a more effective higher level reporting tool for team and management review of all the projects going on. Built in Visio.
Represented; project, resources, time frames. percent done, current status, resource % availability, alt resource outside group. highlighted time for team actions, hold up actors, milestones , PTO, open/close dates, documentation hyperlinks.
It was typical to manage 50 to 60 projects with my team.
vmware-srm | vsphere_vadp_restore |
---|---|
SQL Log Shipping | CommVaultSB-EdgeToCore-Diagram |
Disaster recovery, and business continuance
-
Disaster Recovery,
-
Designated corporate apps replicated to off site hub site - 350 miles inland.
-
Generator / UPS
-
VMware infrastructure,
-
DC
-
Warm Fail over
-
Hyperion Financial systems
-
SQL
-
Email
-
Xen
-
File Server - HR, IT
-
-
Cold Standby 48 hrs - 12 systems
-
Cold Standby 72 hrs - 30 Systems
Example work
Only a very small sample of examples available, just a tip of the iceberg
Other Project Management
Residential Home |
---|
House Project Plan Capture |
HousePlan2ndFloor |
HousePlan1stFloor |
General Contractor/PM Residential Home
-
Designed & Project Managed/GC, 2650 Sq. Ft. Colonial
-
87K under budget of surrounding builds, while still implementing quality items and extras. ( Want to know the secret, feel free to ask )
-
Steel beams to eliminate lolly columns
-
Metal sheathed house wiring, underground utility feeds
-
AC, central vac, whole house fan, room fans, hw alarm
-
All rooms wired for 1g and intercom
-
Hot water return line, maintains hot water through out & separate water run for toilets
-
850 sf work shop with separate entry
-
Designed with SSW exposure for sun exposure for solar.
-
Redundant footing drainage and rain runoff
-
Some assembly required :)
Blueprint knowledge
-
Electronic & Electrical Schematics
-
Building & Mechanical, Drafting
-
Machining